Knapp started working with Taylor Frac in 2011 when they needed to ship large qualities of sand out quickly to meet the industry needs. During that time, Knapp Railroad Builders installed several thousands of feet of track along with numerous turnouts. The quality job was completed quickly and efficiently, and Taylor Frac is still thriving today.
Menu
- About Us
- — History of Knapp
- Our Services
- — Industrial Rail and Track Construction
- — Narrow Gauge and Miniature Railroads
- — Railroad Grading and Erosion Control
- — Track Inspection
- — Snow Removal
- — Switches, Diamonds and Crossovers
- — Panelized Track and Turnouts
- Equipment
- Projects
- — TAYLOR FRAC
- — SUPERIOR SILICA
- — PREFERRED SANDS
- — Atlas Resin / Badger Mining – Taylor
- — Atlas Resin – Merrillan East & West
- Safety and Standard of Excellence
- Contact Us