Atlas Resin – Merrillan East & West

In 2010, Atlas Resin came to us with a need to install several thousands of feet of track and several turnouts at each of their two new facilities. Due to the separation of the two plants, Atlas Resin needed additional storage tracks and turnouts. The first plant was up and in operation while we continued to work on the second plant.